Due to complex geological conditions and the poor state of the road, solutions were implemented to ensure safer and more reliable connectivity. During reconstruction, the carriageway width was adjusted in accordance with KTR 08 requirements. Embankment reinforcement solutions were installed, including driven piles, retaining walls, and gabions. Additionally, six new culverts were installed, along with an open-type culvert with sheet pile walls and reinforced concrete drainage channels to enable efficient water runoff. The number of road curves was also reduced, improving driving conditions and visibility. After the completion of the works, the road became safer, more comfortable, and compliant with applicable standards.