Physical barrier – Southern and Northeastern sections

Featured image
Project title:

Installation of the Physical Barrier in the Territory of the Republic of Lithuania (Southern and Northeastern Sections). Physical Barrier – Southern and Northeastern Sections

Completed works:
Contract work
Type of construction:
New construction
Object location:
Southern and Northeastern Border Sections of the Republic of Lithuania
Builder:
SBGS (State Border Guard Service) – tender announced by UAB EPSO-G
Fegda group companies:
Alkesta
Completed:
2022
Parameters:
Total concertina height above ground: approximately 4 meters

Installation of the Physical Barrier in the Territory of the Republic of Lithuania (Southern and Northeastern Sections)

The physical barrier was installed within the territory of the Republic of Lithuania to strengthen control over illegal migration across the border with Belarus. This project represents an important step toward ensuring border security and order, helping manage migration flows and maintain national safety.

Completed Works:

  • Driving of posts – ensured a solid structure capable of withstanding various environmental conditions;
  • Installation of fence segments – created a barrier that effectively separates territories and prevents illegal crossings;
  • Mounting of supports – formed a stable construction, guaranteeing durability and reliability;
  • Installation of wire and concertina – additional protective measures were installed, especially sharp-edged concertina wire, which restricts the possibility of climbing over or passing through.

This physical barrier not only helps control illegal migration but also contributes to strengthening regional security by ensuring better surveillance and border protection.

Enlarged image

Gallery

CONTACTS

Together we create the future today

Find out more about the process and results, our expert team and offers.