Following the implementation of the project, a grade-separated intersection replaced the former level crossing, allowing traffic on the A15 road to pass over the railway without interruption. A new overpass was constructed during the reconstruction, ensuring safer and smoother traffic flow, reducing delays, and increasing both road and rail safety. This solution improved connectivity and contributed to the development of more efficient transport infrastructure in the region.