A5 Kaunas–Marijampolė–Suwałki, section from 35.40 km to 45.15 km

Featured image
Project title:

Reconstruction of the A5 Kaunas–Marijampolė–Suwałki road section from 35.40 km to 45.15 km (including the construction of a viaduct at 39.96 km, a tunnel viaduct at 42.22 km, and a wildlife underpass at 44.59 km)

Completed works:
Contract work
Type of construction:
Reconstruction
Object location:
Kazlų Rūda District Municipality
Builder:
AB Via Lietuva (formerly the Lithuanian Road Administration – LAKD)
Fegda group companies:
SRP projektas
Completed:
2017
Parameters:
Length 9,75 km | Road surface width (two lanes) 11,5 m -12,5 m

The reconstruction of the A5 Kaunas–Marijampolė–Suwałki motorway, section from 35.40 km to 45.15 km, has been successfully completed, significantly improving connectivity between Lithuania, Poland, and the Baltic States. This project is especially important for regional economic development, mobility, and traffic safety.

Key Works Completed:

  • Viaduct constructed at 39.96 km, ensuring smooth and safe traffic flow;
  • Tunnel viaduct built at 42.22 km, enhancing road infrastructure and improving traffic capacity;
  • Wildlife underpass constructed at 44.59 km, reducing traffic hazards and allowing safe animal migration.

The implementation of this project has not only improved travel conditions but also increased the efficiency of the international transport corridor by reducing congestion and contributing to road safety and environmental preservation.