Vilnius Western Bypass – Stage II

Featured image
Project title:

Vilnius Western Bypass – Stage II (from Oslo St. to Ozo St.)

Completed works:
Contract work
Type of construction:
New construction
Object location:
Vilnius
Builder:
Vilnius City Municipality
Fegda group companies:
Fegda
Completed:
2013
Parameters:
Expressway A1 category: 2.84 km | Viaducts: 4 units | Stormwater drainage networks: 8.42 km | Power supply networks: 26.35 km | 100 piles installed | 3 adjacent streets reconstructed (L. Asanavičiūtės, D. Gerbutavičiaus, Pilaitės Ave.)

Vilnius Western Bypass – Stage II

The second stage of the Vilnius Western Bypass involves the construction of a new A1-category high-speed road from Oslo Street to Ozo Street. This project ensures faster and more convenient connectivity between the suburbs and districts of Vilnius, significantly improving the city’s transportation infrastructure.

Impact on the city:

  • Improved accessibility: The newly built expressway facilitates travel between the city’s suburbs and outlying areas, reducing travel time.
  • Reduced traffic and pollution: The bypass has significantly decreased both traffic congestion and air pollution in central Vilnius streets, as most vehicles can now efficiently bypass the city center.

Long-term benefits:

  • Enhanced transport connections increase Vilnius’ competitiveness and strengthen economic and logistical ties between the city and its surrounding regions.
  • Improved quality of life for residents, as reduced traffic and emissions contribute to a healthier urban environment.
Enlarged image

Gallery

CONTACTS

Together we create the future today

Find out more about the process and results, our expert team and offers.