Technical Design for the Reconstruction of the Stadium of Lapių Basic School in Kaunas District

Featured image
Project title:

Technical design for the reconstruction of the stadium of Lapių Basic School located at A. Merkio St. 6B, Lapių town, Lapių eldership, Kaunas District Municipality

Completed works:
Technical project
Type of construction:
New construction, Reconstruction
Object location:
A. Merkio St. 6B, Lapių town, Kaunas District Municipality
Builder:
Kaunas District Municipality Administration
Fegda group companies:
Plentprojektas
Completed:
2025
Parameters:
Sports field: 4,568 m² | Access paths: 709 m²

Existing Situation

The project solutions are planned within the land plot located at Antano Merkio St. 6B, Lapių town, Kaunas District Municipality, where the existing stadium of Lapių Basic School is currently situated.

The stadium is fenced, and near the entrance there is bicycle parking infrastructure including a shelter and bicycle racks.

The running tracks are surfaced with asphalt. Their length is not optimal, with the inner perimeter measuring 260 m. The tracks are separated by lawn curbs.

At both ends of the stadium there are asphalt basketball courts with fixed basketball stands. The southern basketball court measures 24 m × 13 m, while the northern court measures 20 m × 11 m.

The stadium also includes a football field with natural grass, equipped with permanent goalposts. The field measures 72 m in length and 38 m in width.

The terrain of the stadium and surrounding area is flat. There are no plantings within the stadium area, although a row of thuja trees planted by residents is located outside the fence on the eastern side.

Engineering networks crossing the stadium plot include water supply, sanitary sewage, gas pipelines, stormwater drainage, electricity and telecommunications networks.

Design Solutions

  • The technical design for the reconstruction of the stadium of Lapių Basic School was commissioned by the Kaunas District Municipality Administration. The project contractor is UAB Plentprojektas.
  • Main purpose of the structures: Sports engineering structures, other engineering structures and engineering networks
  • Construction type: Reconstruction and new construction
  • Structure category: Non-special and simple structures
  • Project stage: Technical design

Planned Structures

  • Sports field – reconstruction
  • Access paths – new construction
  • Ball-stop fences – new construction
  • Fence – new construction
  • Stormwater drainage networks – new construction