Railway section: Poland–Lithuania State Border – Mockava

Featured image
Project title:

Reconstruction of the existing railway section from the Poland–Lithuania State Border to Mockava (1435 mm standard gauge track)

Completed works:
Contract work
Type of construction:
Reconstruction
Object location:
Kalvarija Municipality
Builder:
AB Lietuvos geležinkeliai (client: UAB Geležinkelio tiesimo centras)
Fegda group companies:
Alkesta
Completed:
2014

Implementation of the reconstruction project for the existing 1435 mm railway section from the Poland–Lithuania State Border to Mockava is underway. This modernization is crucial for improving international connectivity, ensuring smoother and more efficient railway transport between Lithuania and Poland.

The project involves upgrading the railway infrastructure to enhance traffic safety, increase transport capacity, and improve travel speed. These improvements will contribute to regional economic growth, strengthen logistics chains, and enhance conditions for both passenger and freight transport.

The reconstruction is significant not only for Lithuania but also for the entire Baltic region, as it forms a strategic part of the European standard gauge network connecting the Baltic States with Western Europe.