Access road to Santaka DASRS

Featured image
Project title:

Construction works of the Lithuanian section of the gas pipeline interconnection between Poland and Lithuania. Construction of the access road to the Santaka Gas Metering and Pressure Regulation Station (DASRS).

Completed works:
Contract work
Type of construction:
New construction
Object location:
Išlandžiai Village, Liudvinavas Eldership, Marijampolė Municipality
Builder:
AB Amber Grid (we acted as a subcontractor for UAB Alvora)
Fegda group companies:
Alkesta
Completed:
2021
Parameters:
Length: 321.53 m | Width: 7.5 m | Carriageway width: 5.5 m

The construction of the Lithuanian section of the gas pipeline interconnection between Poland and Lithuania has been completed, including the construction of an access road to the Santaka Gas Metering and Pressure Regulation Station (DASRS). This project is a nationally significant undertaking with major importance at both national and international levels.

Key Highlights of the Project:

  • The gas interconnection contributes to stronger energy ties between Poland and Lithuania, ensuring a reliable gas supply and enhancing energy security in the region.
  • The construction of the access road ensures safe and convenient access to the Santaka Gas Metering and Pressure Regulation Station (DASRS), a critical infrastructure element in the gas supply system.
  • This project has been recognized as strategically important for both regional energy security and the broader European Union energy framework, promoting supply diversification and reducing dependency on a single source.

This gas pipeline interconnection is a significant step toward achieving energy independence.