Following the implementation of the project, a convenient infrastructure was developed at Giruliai Beach to meet the needs of fishermen. A launch area for boats into the Baltic Sea was installed, and gabion retaining walls were constructed to ensure stability and protect the area from erosion. This project improved conditions for fishermen, provided easier access to the water, and contributed to the development of local infrastructure.