Due to challenging geological conditions, it was decided to reinforce the road embankment to ensure long-term stability and safe traffic. The works included the installation of driven piles with pile caps, the placement of a frost-resistant material layer, and the strengthening of the road structure using geosynthetic materials. These solutions improved the durability of the road, reduced the risk of deformation, and ensured reliable connectivity along this section.